Creation of an industrial park for processing of industrial waste, including metal-containing, production of construction products and construction materials from secondary resources, as well as for leasing to residents of prepared land plots or created production, warehouse, office premises.
Nizhnevartovsk city
other
Industry
Khanty-Mansiysk Autonomous Okrug - Ugra, Nizhnevartovsk, Northern industrial hub, 28a 4PS str.; Northern industrial hub, 28a 4PS str.; 8 9PS str., building 2, 3, 4, 5.
86:11:0000000:68245, 86:11:0402001:80, 86:11:0402001:1532, 86:11:0402001:1530
YASHIL PARK SIBERIA LLC Management company
Recycling of metal-containing waste; PVC processing; Oil sludge processing; Processing of bitumen insulation; Repair of machinery and equipment.
1
Private Industrial Park
Foundation for Development of Khanty-Mansiysk Autonomous Okrug – Ugra
Foundation for Development of Khanty-Mansiysk Autonomous Okrug – Ugra; 628012, г. Khanty-Mansiysk, Khanty-Mansiysk Autonomous Okrug – Ugra, Tyumen region, ул. 45 Engelsa Str., block V3, office 220, phone/fax 8 (3467) 388-616, 301-446, e-mail: office@fondugra.ru YASHIL PARK SIBERIA LLC Management company Direrctor General Miroshnichenko Sergey Sergeevich, phone 89633600000
A building permit has been obtained. The selection of a building contractor is carried out.
Renovation of industrial park infrastructure
10,7
Brownfield
It is planned to overhaul and build new production, warehouse and office premises with a total area 64 505 m2.
Settlement lands
2018-2021
1100000
250
508
15.2 km to the Nizhnevartovsk 1 railway station.
Industrial parks
Power supply
Power supply is provided from 0.4 kV RP on the territory of the IP, which is powered from the designed EPTS 10/0.4 kV.
Connection
It is planned to introduce low-current systems: SS (communication and alarm), TSO (technical means of protection), TSN (technical means of video surveillance) and ASDU (system of dispatching and control of on-site networks).
Gas supply
It's designed a gas pipeline with a length of 1,280.93 m. and PGB (type PGB-03-SG-2U1).
Water supply
Technical water supply is carried out from the underground capacity of 50 cubic meters. The hot water supply from the designed modular boiler "VITOTHERM 3500".
Heat supply
Designed block-modular boiler room "VITOTHERM 3500".
Sewage
Sanitary sewer system Removal of domestic waste water is provided in 2 underground storage tanks with a volume of 75 cubic meters and 63 cubic meters with subsequent removal of domestic waste water to the reception center of Gorvodokanal JSC of Nizhnevartovsk.
Car roads
1 road line.
Railways