Information about the project

Creation of an industrial park for processing of industrial waste, including metal-containing, production of construction products and construction materials from secondary resources, as well as for leasing to residents of prepared land plots or created production, warehouse, office premises.

Municipality

Nizhnevartovsk city

Industry

other

type of activity

Industry

Location, address

Khanty-Mansiysk Autonomous Okrug - Ugra, Nizhnevartovsk, Northern industrial hub, 28a 4PS str.; Northern industrial hub, 28a 4PS str.; 8 9PS str., building 2, 3, 4, 5.

Cadastral parcel number

86:11:0000000:68245, 86:11:0402001:80, 86:11:0402001:1532, 86:11:0402001:1530

Management company

YASHIL PARK SIBERIA LLC Management company

Specialty residents

Recycling of metal-containing waste; PVC processing; Oil sludge processing; Processing of bitumen insulation; Repair of machinery and equipment.

Residents

1

Form of ownership

Private Industrial Park

Supervisor

Foundation for Development of Khanty-Mansiysk Autonomous Okrug – Ugra

Contacts

Foundation for Development of Khanty-Mansiysk Autonomous Okrug – Ugra; 628012, г. Khanty-Mansiysk, Khanty-Mansiysk Autonomous Okrug – Ugra, Tyumen region, ул. 45 Engelsa Str., block V3, office 220, phone/fax 8 (3467) 388-616, 301-446, e-mail: office@fondugra.ru YASHIL PARK SIBERIA LLC Management company Direrctor General Miroshnichenko Sergey Sergeevich, phone 89633600000

Project stage

A building permit has been obtained. The selection of a building contractor is carried out.

Stage description

Renovation of industrial park infrastructure

Total area, ha

10,7

Greenfield/Brownfield

Brownfield

Description (structure types, features, area)

It is planned to overhaul and build new production, warehouse and office premises with a total area 64 505 m2.

Category of lands

Settlement lands

Term of realization

2018-2021

Investment capacity, ths. rubles

1100000

Number of jobs

250

Distance to the regional centre, km

508

Railway lines

15.2 km to the Nizhnevartovsk 1 railway station.

Sort by Yip of TLC the Land

Industrial parks

Services offered

Rent of office and/or production, warehouse space, utilities for electricity, water supply, heat supply, sanitation, maintenance of common property (roads, lighting, protection of territory and buildings, etc.) and property of anchor residents (cleaning of open warehouses, internal driveways, etc.).
On-site engineering infrastructure

Power supply

Power supply is provided from 0.4 kV RP on the territory of the IP, which is powered from the designed EPTS 10/0.4 kV.

Connection

It is planned to introduce low-current systems: SS (communication and alarm), TSO (technical means of protection), TSN (technical means of video surveillance) and ASDU (system of dispatching and control of on-site networks).

Gas supply

It's designed a gas pipeline with a length of 1,280.93 m. and PGB (type PGB-03-SG-2U1).

Water supply

Technical water supply is carried out from the underground capacity of 50 cubic meters. The hot water supply from the designed modular boiler "VITOTHERM 3500".

Heat supply

Designed block-modular boiler room "VITOTHERM 3500".

Sewage

Sanitary sewer system Removal of domestic waste water is provided in 2 underground storage tanks with a volume of 75 cubic meters and 63 cubic meters with subsequent removal of domestic waste water to the reception center of Gorvodokanal JSC of Nizhnevartovsk.

Car roads

1 road line.

Railways